About Metrolight
Technology Overview
Management Team
Investors
Sustainability
Careers
Ballasts
Control & Management
EcoBOX™
EcoPOD System
Highbay Kit - EcoPOD
SmartHID Ceramic Solutions
Metrolight LitoComTM LED Driver Communication Interface
VDrive - Driverless Driver™
Metrolight DLD™ 480W Programmable IoT DriverlessDriver™ (Coming Soon)
LUMISQUARE - High Brightness, High Bay LED Fixture
Metrolight LitoPower™ 200W
LitoDrive Overview
LitoDrive 40W
LitoDrive 75W
LitoDrive 90W
LitoDrive 105W
LitoDrive 150W
LitoDrive HV 200/S*
LitoDrive 200W
LitoDrive 240W
LitoDrive 320W
LitoRemote IR Remote Control
LED Overview
Smart Tool LED Software
50-150W Programmable LED Driver
150-450W Programmable LED Driver
450-600W Programmable LED Driver
Class I Converter
Class 2 (USA) & II/III (EU) Converter
Multichannel Controller, 4 Channels Class I
Multichannel Controller, 8 Channels, Class 2, II and III
1 LED Driver for Multiple Fixtures
Programmable LED Light Engine Kit
High Bay LED Fixture
Highbay LED Fixture (low profile)
Area Lighting LED Fixture
Floodlight LED Fixture
eHID to LED Technology
Retail
Industrial
Auto Dealerships & Parking Lots
Logistics & Warehousing
Urban & Street Lighting
Gas Stations
Case Studies
Partners Worldwide
Your Local Partner
Partner Zone
Become a Partner
Press Releases
Events
In the News
Videos
1,000W Retrofit Program
Collateral
CO2 Calculator
ROI Calculator
Incentive & Rebate Information
Contact Form
Metrolight Offices
Metrolight

In The News

Best Practice Sharing by our Australian Partner, GreenEarth Energy Ltd.: "Successful installation of Linfox Warehouse in WA with over 60% energy savings achieved"

Nov. 21, 2012

"The past three months have been integral in firming up opportunities and executing current new installations for the Metrolight electronic HID “eHID” lighting product.

One of the highlights during this period was the successful completion of an installation for a Linfox / Goodman Group warehouse in Western Australia. The West Australian Premier, Colin Barnett, was on hand for the opening ceremony, along with company owners Lindsay Fox and Peter Fox.  The Hazelmere facility is over 80,000m2, with more than 130 Linfox and customers’ staff working at the new warehouse.  This warehouse saw over 320 fittings installed across the site. 

Post the installation, an external review was commissioned and performed by a highly regarded independent Energy Efficiency Consulting firm, which reported the following key results:

•  Energy savings of over 60% kWh/per year

•  Greenhouse gas abatement of 259 ton CO2-epa

•  Overall cost savings on electricity usage of 61%

•  A 36% reduction in fittings required in comparison to competing products

These independent results are an extremely impressive qualification, of the potential of this technology across the Industrial, Manufacturing and Warehouse market in not only Australia, but also potentially the greater Asia Pacific region.  On the back of these results, we have begun looking for new opportunities to distribute this product to a wider audience which has included a specific focus on the OEM (Original Equipment Manufacturer) markets for  Asia Pacific region."

Source: Greenearth Energy Ltd. Quarterly Report September 2012